SENIOR PRODUCTION TECHNOLOGIST in Lagos, United States
at | |
Location | Lagos, United States |
Date Posted | May 30, 2018 |
Category |
Petroleum Engineer
|
Job Type |
Permanent
|
Description
Lead Well performance modelling, sand
prediction, sand control selection and upper completion design, perforating and
smart well design for land and swamp operations. Work in an integrated study
team (as a member or a study team lead) to mature opportunities. Make PT input
into field development plan. The goal is to optimally and profitably extract
hydrocarbon from the Assets.
Ensure compliance with well, reservoir and
facility management, well integrity, control guidelines and taking appropriate
actions in assigned field/s. This is to safeguard the assets and assure
reputation of the company.
Identification of short term oil opportunities
for ranking in the business planning processes and the maturation of short term
oil opportunities within the asset team.
Ensure flow assurance for the life cycle of the
completed wells. Incorporate mitigation strategies into production optimisation
plans.
Identify candidate wells, which have
near‐wellbore or wellbore damage for stimulations (e.g. acid or hydraulic
stimulations) and design suitable treatment. Monitor the stimulations
operations and evaluate the results.
Identify water or gas shut‐off candidates wells
and design treatments (mechanical and chemical treatments). Monitor operations
and evaluate results.
Identify wells that require additional and/or
re‐perforations, due to high mechanical skin and design operations (e.g. gun
selection, drawdown). Monitor operations and evaluate results.
Generate an activity proposal for any of the
above operations, which contains the economic justification functional design
and programme outline.
Generate well/system model (incl. the artificial
lift) to compare actual performance with predicted.
Identify wells that are not optimized and
initiate actions/well interventions to change the operating conditions.
Identify wells that are not performing and review options to improve inflow
performance.
Generate a well/reservoir surveillance plan, in
conjunction with other disciplines, obtain key data and incorporate it into
asset surveillance plan.
Identify candidates for BHPs, production logging
related cased hole logs and design theoperation. Monitor operations and
evaluate results.
Qualifications
As a Senior Production Technologist, incumbent should have a
broad understanding of other E P disciplines and skills in all key
Production technologist specialties. A university degree in Engineering or
equivalent with 9 ‐ 11 years relevant experience, including a minimum of 9
years PT work experience in an operating company. Skills in the following:
Well Modeling Performance
Production System Optimization
Conformance Technology
Well Integrity Management and Determining Well
Operating Envelope
Planning Design of Well Intervention
Activities
HSE considerations in well management and
completion operations
Completion Design and supervision
Oil well cementing and Drill‐in Fluids
Knowledge in Production Operation
Coaching/Mentoring