Senior Production Technologist in Kuala Lumpur, Malaysia

at Petrofac
Location Kuala Lumpur, Malaysia
Date Posted January 24, 2020
Category Petroleum Engineer
Job Type Permanent

Description

Kuala LumpurSenior Production Technologist-050870
Description

Leads production technology activities within feasibility studies, conceptual and detailed engineering phases of Cendor 2 development project. Participates in development of life cycle production targets, economic, contractual and reservoir management objectives, ongoing enhancement of the field production, together with the other team members.

Primary Duties:
Responsible for proactively leading the management of risk to people with the team.
Ensure that Health, Safety, Security, Environment and Asset Integrity personal objectives and targets are understood at all level.
Works with Project Team to define the life cycle based well completion designs (artificial lift, sand face, upper completion)
Works with the Project Team for the preparation of the conceptual and detailed well completion Basis of Designs and Well test Basis of Designs.
Works with the Project Team to:
Define different artificial lift methods applicable for new infill wells
Prepare artificial lift / well type matrix
Identify rig & rigless artificial lift optimization opportunities
Identify artificial lift intervention requirements for repair and / or optimization
Evaluate rigless vs. rig interventions
Define artificial lift operation and monitoring system
Identify best applicable performance monitoring devices
Evaluate operational practices applicable in Cendor 2
Estimate cost & added value of monitoring system
Discuss artificial lift types with equipment suppliers and Peer Review - Workshop
Start conceptual artificial lift design for each well type
Prepare artificial lift design in conjunction with equipment suppliers
“Design tubulars, auxiliary equipment, cables, pumps, motors, protectors, etc.”
Evaluate technical feasibility
Determine technical challenges and mechanical risks
Identify hazardous situations and risks involved
Estimate extra power & facility upgrade requirements
Perform economic & risk analysis.
6.Write report on artificial lift strategy
Reviews well/field performances with the advice of Reservoir Engineering and Geoscientists for optimum ultimate recovery, to recommend required workovers for production improvements.
Prepares all single well models (nodal analysis) and ensures all are validated and matched with the actual well data.
Analyses individual well gas lift performances and proposes remedial activities.
Analyses production chemistry effects on well performance.
Reviews historical well stimulation activities and provides analysis.
Analyzes and defines the cause of well performance failures and generates candidates for productivity enhancement.
Proposes & designs preventative and remedial activities.
Provides an assessment of safety and environmental impact for all recommendations.
Creates cost estimates and manages cost, schedule and quality of the respective production enhancement services to be executed by service contractors.
Participate in HAZOP’s, risk assessments and other workshops as required for project execution.
Provides key link between subsurface group, drilling & well construction, production operations and other parties.
Interfaces between the various disciplines in the Project team.
Close-out project for document archiving.
Desired Skills and Experience:
Degree in Engineering, Physics, Chemistry or Earth Science from recognized university
Minimum 8 years working experience in similar position, preferably with an oil company
Technical knowledge of and familiarity with aspects of reservoir characterisation, drilling, well testing, well operations, process facilities and production chemistry.
Very familiar with software covering well test analysis, well flow analysis, OFM
Analytical and interpretative skills / expertise in:
Multiphase flow modelling and prediction, including artificial lift design

Job Subsurface
Primary Location Malaysia-Kuala Lumpur-Menara Prestige
Organisation Subsurface Technical:Petroleum Engineering:IESMal
Closing Date (Period for Applying) - External 22/02/2020, 11:59:00 PM

Drop files here browse files ...

Related Posts