Production Technologist in Lagos, Nigeria

at Sahara Group Limited, Nigeria
Location Lagos, Nigeria
Date Posted April 30, 2019
Category Petroleum Engineer
Job Type Permanent

Description

LagosPurpose Statement:
The role provides the linkage and understanding of production optimization and initiations within the subsurface and the surface production disciplines to understand the happenings down-hole and its relation to surface well behaviors, beyond the process separators.
Key Deliverables
Lead the Production Data Management for Petroleum Engineering Department and Champion Hydrocarbon Accounting Implementation / Reconciliations
Deliver well & completions designs for all wells, Production optimization and multi‚Äźdiscipline projects in accordance with World Class Hydrocarbon Maturation and Well Delivery and Intervention projects in accordance with World Class Hydrocarbon Maturation and Well Delivery and Intervention Processes, and the deliverables set by client requirements to optimize Oil & Gas recovery.
Significantly contribute to/ lead the delivery of quality reservoir development studies, field development plan (FDP), the Identification of production improvement opportunities and production optimization studies in conjunction with reservoir engineers, petro physicists and production geologists.
Well surveillance - Well Performance monitoring, Monitoring and follow-up/resolution of Production deferment issues, Bean-up candidates identification/ follow-up for execution.
Coil Tubing job planning, well stimulations. Low production/Off-Production monitoring (wells).
Production Technology contribution to Field Review.
Well Performance Review: Identification of wells for Coil Tubing re-entry and Rig re-entry for repairs.
Monthly Production Targets: Assist in driving the Production Target by working with the field production Staff
Conceptual Completion Design, understanding of a completions design and their services interfaces
MER Coordination and Interface Management with DPR
Production Technology input (Well histories and well performance review/ update. production performance plots generation, well performance (NODAL analysis) to Field review
Provide analysis of well and reservoir performance base on production data, statutory pressure surveys (BHPs), Build up pressure analysis (PBU), and MPLT.
Run SAPHIRE to analyze build up pressure data.
Field Development & Execution
Day to Day Production Surveillance and reporting
Knowledge/Skills:
Prosper, IPM, GAP and SAPHIRE
Completions Conceptual design Tubing Design
Production Rates for Initial and Recompletion determination
Production Optimization and Well Head Maintenance
BHP Design and Surveys
Nodal Analyses
Coil Tubing/ Slickline Operations and E-line Operations
MER design and TAR determination
Conceptual Completion Design, understanding of a completions design and their services interfaces
MER Coordination and Interface Management with DPR
SCON and Sanding Prediction for Sand Control Decisions and Implementation Run SAPHIRE to analyze build up pressure data.
Field Development and Re-Completions Knowledge
The position would require to be filled by a very competent candidate of not less than 10yr Production Technologist experience with of the wells, well-head maintenance & scheduling, production optimization and hydrocarbon volumes reconciliation and accounting.
Minimum Qualification/ Experience:
Bachelor's degree in Engineering, Petroleum Engineering / Related Technical Disciplines
Minimum of 10-years' core experience in Production Technology / Engineering
Strong working knowledge of IPM-GAP, Prosper, OFM and SAPHIR
Skill sets in Well surveillance, Nodal Analyses, Inflow and outflow performances
Personality Traits:
Team Player
Detailed and methodical
Attention to details
Good interpersonal skills
Willing to take on Challenges
Working Relationships
Petroleum Engineering Manager
Internal and external stakeholders
JV Partners and all government regulators
Production operations team

Related Posts